MA37 Albury Wodonga Regional Hospital Project
近期公告
  • 19th 三月 2026, Daily Brief

    Fix & Form continued works to grid 3

    C&D continuing NDD along Telstra line- Borella Rd and continued works to NEB West and IPO, change of pedestrian access

    Creative
    IPO continued walls linings

    SJTA installing hold down bolts

    Maintain work zones,

    Steel and materials are to be removed from the North by the 20/03/26 to allow structural steel deliveries and crane set up.

    C&D removal of container next week.

    Bookings have changed you are able to select the truck to help understand what's required.

现场天气预报
当前现场天气

最近更新: 0:01
温度: 16C (应用程序 16C)
风速: 0KMH
最大 风: 0KMH @0:01
自上午9点开始降雨: 0.0mm
最低温度: 15C @22:28 2026/4/4
最高温度: 24C @15:20 2026/4/4
阵风: 4KMH
最大风力: 4KMH @0:01


观测信息来自 - Bureau of Meteorology
观测位置 - Albury、NEW SOUTH WALES
时区 - 澳大利亚东部标准时间
预测 - 星期日、5 四月

Partly cloudy.
最低: 13C 最大: 24C
可能有雨。: 30%
预计降雨: 0 至 1mm


预测信息来自 - Bureau of Meteorology
预测位置 - Albury、NEW SOUTH WALES
时区 - 澳大利亚东部标准时间
明天 - 星期一, 6 四月

Shower or two.
最低: 13C 最大: 26C
可能有雨。: 60%
预计降雨: 0 至 2mm


重要现场文件
  • MA37 PLN-CORP-HSE-003 Emergency Response Plan rev 0 (002)

    已上传2025/12/3

    save_alt 下载
  • HammerTech - Induction Steps (Shed Wall Poster)

    已上传2024/9/23

    save_alt 下载
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册