19th maart 2026, Daily Brief
Fix & Form continued works to grid 3
C&D continuing NDD along Telstra line- Borella Rd and continued works to NEB West and IPO, change of pedestrian access
Creative
IPO continued walls linings
SJTA installing hold down bolts
Maintain work zones,
Steel and materials are to be removed from the North by the 20/03/26 to allow structural steel deliveries and crane set up.
C&D removal of container next week.
Bookings have changed you are able to select the truck to help understand what's required.
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 00:01
Temperatuur: 16C (App 16C)
Windsnelheid: 0KM/U
Max. Wind: 0KM/U @00:01
Regen sinds 9:00 uur: 0,0mm
Min.temp: 15C @22:28 4-4-2026
Max.temp: 24C @15:20 4-4-2026
Windvlaag: 4KM/U
Max. windvlaag: 4KM/U @00:01
Waarneming Locatie - Albury, NEW SOUTH WALES
Tijdzone - Oost-Australische standaardtijd
Weerbericht - zondag, 5 april
Partly cloudy.
Min.: 13C Max.: 24C
Kans op neerslag: 30%
Verwachte regen: 0 tot 1mm
Weerbericht locatie - Albury, NEW SOUTH WALES
Tijdzone - Oost-Australische standaardtijd
Morgen - maandag, 6 april
Shower or two.
Min.: 13C Max.: 26C
Kans op neerslag: 60%
Verwachte regen: 0 tot 2mm
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.