MA35 | Lutheran Aged Care Albury - Site proiect public
-
05th iunie 2025, daily brief 5/6/25
STRICTLY NO PARKING ONSITE
Civil works ongoing,
Access through middle gate on Obrian Court. these will change with the civil works.
concrete set out
HARDHATS MUST BE WORN BY ALL TRADES AT ALL TIMES
HI VISE TO BE WORN AT ALL TIMES.
10m bin is to be used for rubbish.
- Ensure exclusion zones are in place while using the plant and permits are up to date.
- Ensure pre-starts are complete prior to using the plant
-Plaster installation to the cafe area.
- Allied Health floor has been laid ensure you keep your feet and work zones clean use drop sheets when required.
-Column infills are being installed.
-Check all electrical equipment is tested and tagged.
Condiții meteo curente la șantier
Ultima actualizare la: 08:21
Temperatură: 15C (Aplicație 14C)
Viteza vântului: 6KMH
Max. Vânt: 6KMH @08:21
Ploaie de la 9 AM: 0,0mm
Temp min: 10C @04:44
Temp max: 24C @15:20 04.04.2026
Rafală: 6KMH
Rafală max: 7KMH @06:21
Locație observație - Albury, NEW SOUTH WALES
Fus orar - Ora standard a Australiei Orientale
Prognoză - duminică, 5 aprilie
Partly cloudy.
Min: 13C Max: 24C
Șanse de ploaie: 30%
Precipitații așteptate: 0 la 1mm
Locație prognoză - Albury, NEW SOUTH WALES
Fus orar - Ora standard a Australiei Orientale
Mâine - luni, 6 aprilie
Shower or two.
Min: 13C Max: 26C
Șanse de ploaie: 60%
Precipitații așteptate: 0 la 2mm
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.