MA35 | Lutheran Aged Care Albury - Veřejná stránka projektu
-
05th června 2025, daily brief 5/6/25
STRICTLY NO PARKING ONSITE
Civil works ongoing,
Access through middle gate on Obrian Court. these will change with the civil works.
concrete set out
HARDHATS MUST BE WORN BY ALL TRADES AT ALL TIMES
HI VISE TO BE WORN AT ALL TIMES.
10m bin is to be used for rubbish.
- Ensure exclusion zones are in place while using the plant and permits are up to date.
- Ensure pre-starts are complete prior to using the plant
-Plaster installation to the cafe area.
- Allied Health floor has been laid ensure you keep your feet and work zones clean use drop sheets when required.
-Column infills are being installed.
-Check all electrical equipment is tested and tagged.
Aktuální počasí na pracovišti
Naposledy aktualizováno v: 22:21
Teplota: 12C (Aplikace 11C)
Rychlost větru: 9KMH
Max. vítr: 15KMH @15:21
Déšť od 9 ráno: 0,0mm
Min. teplota: 12C @7:26
Max. teplota: 20C @13:23
Náraz větru: 9KMH
Max náraz větru: 17KMH @15:21
Místo pozorování - Albury, NEW SOUTH WALES
Časové pásmo - východoaustralský standardní čas
Předpověď – středa, 17 června
Showers.
Min: 11C Max: 17C
Možnost deště: 100%
Očekávaný déšť: 10 k 25mm
Místo předpovědi – Albury, NEW SOUTH WALES
Časové pásmo - východoaustralský standardní čas
Zítra - čtvrtek, 18 června
Showers.
Min: 10C Max: 15C
Možnost deště: 95%
Očekávaný déšť: 3 k 10mm
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.