• The Emergency muster point is in front of the entrance to Gantry 2
• The first aid room and defibrillator is located in the HSE
Office on gantry 2
• Keep the HEPA Filter on at all times.
• SILICA DUST: ENGINEERING CONTROL MUST BE USED
WHEN DRILLING
• Task lighting required
• P2 Mask MUST be worn when drilling above the ceiling
height
• MASK REQUIRED WHEN TRAVELLING THROUGH LIVE
WARDS IN THE HOSPITAL
Current Site Weather
Last Updated at: 8:21 AM
Temperature: 51F / 10C (App 42F / 6C)
Wind Speed: 14MPH
Max. Wind: 14MPH @8:21 AM
Rain since 9AM: 0.0in
Min Temp: 45F / 7C @6:50 AM
Max Temp: 62F / 17C @12:48 PM 2026-04-04
Gust: 16MPH
Max Gust: 16MPH @8:21 AM
Observation Location - Hobart, TASMANIA
Time Zone - Australian Eastern Standard Time
Forecast - Sunday, 5 April
Showers increasing.
Min: 48F / 9C Max: 70F / 21C
Chance of Rain: 80%
Expected Rainfall: 0 to 0.3in
Forecast Location - Hobart, TASMANIA
Time Zone - Australian Eastern Standard Time
Tomorrow - Monday, 6 April
Showers easing.
Min: 57F / 14C Max: 68F / 20C
Chance of Rain: 80%
Expected Rainfall: 0 to 0.3in
Do you know the PPE Requirements for this site?
Ensure you have the correct safety equipment for your first day at the site.
Get started working sooner when you arrive on site.
Enrol online at your convenience and save yourself time.
Do you know the PPE Requirements for this site?
Ensure you have the correct safety equipment for your first day at the site.
Get started working sooner when you arrive on site.