HC0726-199 - Linac - Offentlig prosjektsted
-
03rd februar 2026,
• The Emergency muster point is in front of the entrance to Gantry 2
• The first aid room and defibrillator is in the HSE
Office on gantry 2
• HARD HAT MUST BE WORN
• Keep the HEPA Filter on at all times.
• SILICA DUST: ENGINEERING CONTROL MUST BE USED
WHEN DRILLING
• Task lighting required
• P2 Mask MUST be worn when drilling above the ceiling
height
• MASK REQUIRED WHEN TRAVELLING THROUGH LIVE
WARDS IN THE HOSPITAL
Vær på anleggsted
Sist oppdatert kl.: 08:21
Temperatur: 10C (App 6C)
Vindfart: 22KMH
Maks. Vind: 22KMH @08:21
Regn side 09.00: 0,0mm
Min. temperatur: 7C @06:50
Maks. temperatur: 17C @12:48 04.04.2026
Vindkast: 26KMH
Maks. vindkast: 26KMH @08:21
Observasjonssted - Hobart, TASMANIA
Tidssone - austaustralsk standardtid
Værmelding – søndag, 5 april
Showers increasing.
Min.: 9C Maks.: 21C
Sjanse for regn: 80%
Forventet nedbør: 0 til 7mm
Sted for værmelding – Hobart, TASMANIA
Tidssone - austaustralsk standardtid
I morgen - måndag, 6 april
Showers easing.
Min.: 14C Maks.: 20C
Sjanse for regn: 80%
Forventet nedbør: 0 til 7mm
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.